_____________________________
Employment
____________________________
GUEST SERVICE AMBASSADOR
BJCC, is recruiting for a Guest Service Ambassador for information & to apply visit https://www.bjcc.org/jobs/ or send resume to careers@bjcc.org /fax resume 205-458-8530.
BT01/02/2025
______________________________
TICKET OFFICER SUPERVISOR
Assistant Ticketing Manager-Operations
BJCC, is recruiting for a Ticket Office Supervisor and an Assistant Ticketing Manager-Operations for information & to apply visit https://www.bjcc.org/jobs/ or send resume to careers@bjcc.org /fax resume 205-458-8530.
BT01/02/2025
______________________________
UNIVERSITY OF MONTEVALLO
Administrative Assistant I
Case Manager
Painter II
Testing Administrator
Transportation & Parking Attendant
Visit https://jobs.montevallo.edu
UM is an AA/EO/F/D/V Institution
BT01/02/2025
______________________________
PERSONAL CARE AIDES
Multiple Full-time positions for personal care aides in BIRMINGHAM, AL are immediately available. Provide personalized assistance to individuals with disabilities or illness who require help with personal care and activities of daily living support (e.g., feeding, bathing, dressing, grooming, toileting, and ambulation). May also provide help with tasks such as preparing meals, doing light housekeeping, and doing laundry. Minimum Requirement: None
BT01/02/2025
______________________________
______________________________
LEGAL
______________________________
CASE NO. CV-2024-903601
THE BIRMINGHAM LAND BANK AUTHORITY, a Public Corporation,
NOTICE OF FINAL HEARING BY PUBLICATION
TO: ESTATE OF DELORES COOPER; NIKI N. COOPER; DELORES S. COOPER; TRACY COOPER; CITY OF BIRMINGHAM, ALABAMA; J.T. SMALLWOOD, JEFFERSON COUNTY TAX COLLECTOR; AND JEFFERSON COUNTY, ALABAMA, and any and all other unknown heirs, claimants or interested parties claiming any right, title, estate, lien, or interest in the real estate described herein,
TAKE NOTICE that on September 9, 2024, the Birmingham Land Bank Authority filed the above-styled Complaint and the Land Bank asserts that it has recorded notice of a pending quiet title and foreclosure action in the Probate Court of Jefferson County, Alabama concerning the rights and/or interests in the following real property:
Lot 18, in Block 2, according to the Survey of Cleveland, as recorded in Map Book 1, Page 19 in the Probate Office of Jefferson County, Alabama.
It appears said legal is the same as that certain legal described in Instrument No. 2019080437 as follows: LOT 18 BLK 2 CLEVELAND
and assigned Parcel ID No. 29-00-09-1-002-026.000
ANY PERSON WITH A PROPERTY INTEREST IN THE ABOVE PROPERTY IS HEREBY NOTIFIED THAT THEY MAY LOSE SUCH INTEREST, IF ANY, AS A RESULT OF THE ABOVE-REFERENCED QUIET TITLE AND FORECLOSURE ACTION. The final hearing on this quiet title and foreclosure action is hereby set for February 7, 2025, in Room 340, Jefferson County Courthouse in Birmingham, Alabama at 9:00 a.m. The judgment of the Court may result in title to the property vesting in the Birmingham Land Bank Authority. Any person who proves to the Court’s satisfaction a right to redeem the property pursuant to Alabama Code §§ 40-10-73 (1975) et seq. or Alabama Code §§ 40-10-83 (1975) et seq. may redeem the property pursuant to those statutes within five (5) days after the appropriate Order on Final Hearing is issued. FAILURE TO REDEEM THE PROPERTY AND PRESENT PROOF OF REDEMPTION TO THE CIRCUIT COURT WITHIN THE 5-DAY PERIOD MAY RESULT IN A LOSS OF THE RIGHT OF REDEMPTION.
The address of the Birmingham Land Bank Authority is City Hall, 710 North 20th St., Birmingham, AL 35203. The Birmingham Land Bank Authority may be contacted care of Jake A. Kiser at (205) 918-5037.
IT IS THEREFORE ORDERED by the undersigned Clerk of Court that publication of this notice be made once a week for three consecutive weeks in The Birmingham Times, a newspaper of general circulation in Jefferson County, Alabama, and that all persons to whom this notice is addressed and any and all persons claiming any title to, interest in, or lien or encumbrance on the above-described land or any part thereof are hereby directed to plead, answer or otherwise respond to the Complaint in this case before the hearing date or a judgment by default may be rendered against them it being intended that this notice shall be used to perfect service against all parties who cannot be personally served with a copy of the Complaint.
Jacqueline Anderson Smith, Circuit Clerk
BT01/02/2025
______________________________
CASE NO. CV-2024-903992
THE BIRMINGHAM LAND BANK AUTHORITY, a Public Corporation,
NOTICE OF FINAL HEARING BY PUBLICATION
TO: SHELDON DUMAS, KATHY DUMAS, J.T. SMALLWOOD, JEFFERSON COUNTY TAX COLLECTOR; AND JEFFERSON COUNTY, ALABAMA, CITY OF BIRMINGHAM, ALABAMA; and any and all other unknown heirs, claimants or interested parties claiming any right, title, estate, lien, or interest in the real estate described herein,
The Birmingham Land Bank Authority (the “Land Bank”), a public corporation organized under the laws of the State of Alabama, filed a Petition to Quiet Title and Foreclosure (the “Petition”) on the property described herein on October 6, 2024, in the Circuit Court of Jefferson County and recorded a Notice of Pending Quiet Title and Foreclosure Action (the “Lis Pendens”) on November 12, 2024, in the Probate Court of Jefferson County, Alabama. Notice is hereby given that a final hearing was set to be heard on January 10, 2025 at 9:30 A.M. at the Jefferson County Courthouse, Courtroom 340, 716 Richard Arrington, Jr. Boulevard, North, Birmingham, Alabama 35203. The property that is the subject of this hearing is described as follows:
Property Address: 2633 17th Street, Birmingham, Alabama 35208
Tax Parcel ID No.: 22-00-32-4-018-002.000 a/k/a 0122003240180020000000
Legal Description: Lot 9, Block B, according to the Survey of Shadyside Park Addition to Birmingham, as recorded in Map Book 13, Page 31, in the Probate Office of Jefferson County, Alabama a/k/a LOT 9 BLK B SHADYSIDE PARK ADD TO BHAM
ANY PERSON WITH A PROPERTY INTEREST IN THE ABOVE PROPERTY IS HEREBY NOTIFIED THAT THEY MAY LOSE SUCH INTEREST, IF ANY, AS A RESULT OF THE ABOVE-REFERENCED QUIET TITLE AND FORECLOSURE ACTION. The judgment of the Court may result in title to the property vesting in the Birmingham Land Bank Authority. Any person who proves to the Court’s satisfaction a right to redeem the property pursuant to Alabama Code 1975 §§ 40-10-83, et seq. may redeem the property pursuant to those statutes within five (5) days after the appropriate Order on Final Hearing is issued. FAILURE TO REDEEM THE PROPERTY AND PRESENT PROOF OF REDEMPTION TO THE CIRCUIT COURT WITHIN THE FIVE-DAY PERIOD MAY RESULT IN A LOSS OF THE RIGHT OF REDEMPTION. The address of the Birmingham Land Bank Authority is City Hall, 710 20th Street North, Birmingham, Alabama 35203 and may be contacted care of the City of Birmingham Law Department at 205-254-2117.
IT IS THEREFORE ORDERED by the undersigned Clerk of Court that publication of this notice be made once a week for three consecutive weeks in the Birmingham Times, a newspaper of general circulation in Jefferson County, Alabama, and that all persons to whom this notice is addressed and any and all persons claiming any title to, interest in, or lien or encumbrance on the above-described land or any part thereof are hereby directed to plead, answer or otherwise respond to the Complaint in this cause before the hearing date or a judgment by default may be rendered against them it being intended that this notice shall be used to perfect service against all parties who cannot be personally served with a copy of the Complaint.
Dated this the 23rd day of December, 2024.
Jacqueline Anderson Smith, Circuit Clerk
BT01/02/2025
______________________________
CASE NO. CV-2024-904325
THE BIRMINGHAM LAND BANK AUTHORITY, a Public Corporation,
NOTICE OF FINAL HEARING BY PUBLICATION
TO: EARL CHAMBLEE, DECEASED, CLAUDE CHAMBLEE, JR AND HIS HEIRS AND DEVISEES, IF DECEASED, CAROLYN HARRIS AND HER HEIRS AND DEVISEES, IF DECEASED, MARY SILVIA HAMM SMITH AND HER HEIRS AND DEVISEES, IF DECEASED, MORGAN EUGENE HAMM AND HIS HEIRS AND DEVISEES, IF DECEASED, BARBARA HAMM BULLOCK AND HER HEIRS AND DEVISEES, IF DECEASED, JOHN ANDREW MCKINNEY, JR AND HIS HEIRS AND DEVISEES, IF DECEASED, JAMES SANDERS HAMM, JR. AND HIS HEIRS AND DEVISEES, IF DECEASED, DIANE CECILIA SCIARA AND HER HEIRS AND DEVISEES, IF DECEASED, BILLY JOYCE CHENOWETH AND HIS HEIRS AND DEVISEES, IF DECEASED, E. PAUL HAMM, JR. AND HIS HEIRS AND DEVISEES, IF DECEASED, PAULA SUE HAMM HUFFAKER AND HER HEIRS AND DEVISEES, IF DECEASED, JOHN WILLIAM HAMM AND HIS HEIRS AND DEVISEES, IF DECEASED, CHERYL BROWN SCOGGINS AND HER HEIRS AND DEVISEES, IF DECEASED, KERRY BROWN AND HIS HEIRS AND DEVISEES, IF DECEASED, JOANNA BERNHARD AND HER HEIRS AND DEVISEES, IF DECEASED, LESLIE THORPE LIPPMANN KAYLOR AND HER HEIRS AND DEVISEES, IF DECEASED, J.T. SMALLWOOD, JEFFERSON COUNTY TAX COLLECTOR; AND JEFFERSON COUNTY, ALABAMA, CITY OF BIRMINGHAM, ALABAMA; and any and all other unknown heirs, claimants or interested parties claiming any right, title, estate, lien, or interest in the real estate described herein,
The Birmingham Land Bank Authority (the “Land Bank”), a public corporation organized under the laws of the State of Alabama, filed a Petition to Quiet Title and Foreclosure (the “Petition”) on the property described herein on October 28, 2024, in the Circuit Court of Jefferson County and recorded a Notice of Pending Quiet Title and Foreclosure Action (the “Lis Pendens”) on December 13, 2024, in the Probate Court of Jefferson County, Alabama. Notice is hereby given that a final hearing was set to be heard on January 10, 2025 at 9:30 A.M. at the Jefferson County Courthouse, Courtroom 340, 716 Richard Arrington, Jr. Boulevard, North, Birmingham, Alabama 35203. The property that is the subject of this hearing is described as follows:
Property Address: 2722 Pike Road, Birmingham, Alabama 35208
Tax Parcel ID No.: 22-00-32-4-016-001.000 a/k/a 0122003240160010000000
Legal Description: A triangular tract or parcel of land in the Northwest Quarter of the Southeast Quarter of Section Thirty-two (32), Township Seventeen (17), Range Three (3) West, described as follows: Begin at the northeast corner of Lot Four (4), in Block Twenty (20) of Shady Side Land Company’s survey, as recorded in Map Book 6, Page 38, in the office of the Judge of Probate of Jefferson County, Alabama; thence east along the south line of Sixteenth Street (formerly Cutter Avenue) and across a forty-foot strip (now Third Street) for a point of beginning; thence south along the east line of said Third Street (sometimes called Barbour Avenue) a distance of 112.7 feet to the north line of Valley Road or Pike Road (formerly Goodwin Avenue); thence in a northeasterly direction along the north line of said Valley Road or Pike Road a distance of 199.4 feet, more or less, to the south line of said Sixteenth Street; thence west along the south line of said Sixteenth Street a distance of 164.5 feet, more or less, to the point of beginning a/k/a ALL THAT PT OF BLK 20 SHADYSIDE LYING S OF 16TH ST NW OF PIKE RD & E OF BARBOUR AVE
ANY PERSON WITH A PROPERTY INTEREST IN THE ABOVE PROPERTY IS HEREBY NOTIFIED THAT THEY MAY LOSE SUCH INTEREST, IF ANY, AS A RESULT OF THE ABOVE-REFERENCED QUIET TITLE AND FORECLOSURE ACTION. The judgment of the Court may result in title to the property vesting in the Birmingham Land Bank Authority. Any person who proves to the Court’s satisfaction a right to redeem the property pursuant to Alabama Code 1975 §§ 40-10-83, et seq. may redeem the property pursuant to those statutes within five (5) days after the appropriate Order on Final Hearing is issued. FAILURE TO REDEEM THE PROPERTY AND PRESENT PROOF OF REDEMPTION TO THE CIRCUIT COURT WITHIN THE FIVE-DAY PERIOD MAY RESULT IN A LOSS OF THE RIGHT OF REDEMPTION. The address of the Birmingham Land Bank Authority is City Hall, 710 20th Street North, Birmingham, Alabama 35203 and may be contacted care of the City of Birmingham Law Department at 205-254-2117.
IT IS THEREFORE ORDERED by the undersigned Clerk of Court that publication of this notice be made once a week for three consecutive weeks in the Birmingham Times, a newspaper of general circulation in Jefferson County, Alabama, and that all persons to whom this notice is addressed and any and all persons claiming any title to, interest in, or lien or encumbrance on the above-described land or any part thereof are hereby directed to plead, answer or otherwise respond to the Complaint in this cause before the hearing date or a judgment by default may be rendered against them it being intended that this notice shall be used to perfect service against all parties who cannot be personally served with a copy of the Complaint.
Dated this the 23rd day of December, 2024.
Jacqueline Anderson Smith, Circuit Clerk
BT01/02/2025
______________________________
CASE NO. CV-2024-904536
THE BIRMINGHAM LAND BANK AUTHORITY, a Public Corporation,
NOTICE OF FINAL HEARING BY PUBLICATION
TO: LEOTIS WILLIAM (DECEASED) AND HIS HEIRS AND DEVISEES; ALABAMA DEPARTMENT OF REVENUE; J.T. SMALLWOOD, JEFFERSON COUNTY TAX COLLECTOR; AND JEFFERSON COUNTY, ALABAMA, CITY OF BIRMINGHAM, ALABAMA; and any and all other unknown heirs, claimants or interested parties claiming any right, title, estate, lien, or interest in the real estate described herein,
The Birmingham Land Bank Authority (the “Land Bank”), a public corporation organized under the laws of the State of Alabama, filed a Petition to Quiet Title and Foreclosure (the “Petition”) on the property described herein on November 11, 2024, in the Circuit Court of Jefferson County and recorded a Notice of Pending Quiet Title and Foreclosure Action (the “Lis Pendens”) on November 27, 2024, in the Probate Court of Jefferson County, Alabama. Notice is hereby given that a final hearing was set to be heard on February 7, 2025 at 9:00 A.M. at the Jefferson County Courthouse, Courtroom 340, 716 Richard Arrington, Jr. Boulevard, North, Birmingham, Alabama 35203. The property that is the subject of this hearing is described as follows:
Property Address: 911 4th Avenue W, Birmingham, Alabama 35204
Tax Parcel ID No.: 29-00-04-1-008-004.000 a/k/a 0129000410080040000000
Legal Description: Lot 4, Block 22, according to the Map and Survey of Owenton as recorded in Map Book 2, Page 26, in the Probate Office of Jefferson County, Alabama a/k/a LOT 4 BLK 22 Owenton
ANY PERSON WITH A PROPERTY INTEREST IN THE ABOVE PROPERTY IS HEREBY NOTIFIED THAT THEY MAY LOSE SUCH INTEREST, IF ANY, AS A RESULT OF THE ABOVE-REFERENCED QUIET TITLE AND FORECLOSURE ACTION. The judgment of the Court may result in title to the property vesting in the Birmingham Land Bank Authority. Any person who proves to the Court’s satisfaction a right to redeem the property pursuant to Alabama Code 1975 §§ 40-10-83, et seq. may redeem the property pursuant to those statutes within five (5) days after the appropriate Order on Final Hearing is issued. FAILURE TO REDEEM THE PROPERTY AND PRESENT PROOF OF REDEMPTION TO THE CIRCUIT COURT WITHIN THE FIVE-DAY PERIOD MAY RESULT IN A LOSS OF THE RIGHT OF REDEMPTION. The address of the Birmingham Land Bank Authority is City Hall, 710 20th Street North, Birmingham, Alabama 35203 and may be contacted care of the City of Birmingham Law Department at 205-254-2117.
IT IS THEREFORE ORDERED by the undersigned Clerk of Court that publication of this notice be made once a week for three consecutive weeks in the Birmingham Times, a newspaper of general circulation in Jefferson County, Alabama, and that all persons to whom this notice is addressed and any and all persons claiming any title to, interest in, or lien or encumbrance on the above-described land or any part thereof are hereby directed to plead, answer or otherwise respond to the Complaint in this cause before the hearing date or a judgment by default may be rendered against them it being intended that this notice shall be used to perfect service against all parties who cannot be personally served with a copy of the Complaint.
Dated this the 23rd day of December, 2024.
Jacqueline Anderson Smith, Circuit Clerk
BT01/02/2025
______________________________
CASE NO. CV-2024-904555
THE BIRMINGHAM LAND BANK AUTHORITY, a Public Corporation,
NOTICE OF FINAL HEARING BY PUBLICATION
TO: DAVID PATRICK AND HIS HEIRS AND DEVISEES ( IF DECEASED); DOLLIE PATRICK AND HER HEIRS AND DEVISEES, IF DECEASED; WMW LAND, LLC, NATIONSBANC FINANCIAL SERVICES CORPORATION OF ALABAMA; J.T. SMALLWOOD, JEFFERSON COUNTY TAX COLLECTOR; AND JEFFERSON COUNTY, ALABAMA, CITY OF BIRMINGHAM, ALABAMA; and any and all other unknown heirs, claimants or interested parties claiming any right, title, estate, lien, or interest in the real estate described herein,
The Birmingham Land Bank Authority (the “Land Bank”), a public corporation organized under the laws of the State of Alabama, filed a Petition to Quiet Title and Foreclosure (the “Petition”) on the property described herein on November 12 2024, in the Circuit Court of Jefferson County and recorded a Notice of Pending Quiet Title and Foreclosure Action (the “Lis Pendens”) on November 27, 2024, in the Probate Court of Jefferson County, Alabama. Notice is hereby given that a final hearing was set to be heard on February 7, 2025 at 9:00 A.M. at the Jefferson County Courthouse, Courtroom 340, 716 Richard Arrington, Jr. Boulevard, North, Birmingham, Alabama 35203. The property that is the subject of this hearing is described as follows:
Property Address: 2741 17th Street, Birmingham, Alabama 35208
Tax Parcel ID No.: 22-00-32-4-021-002.000 a/k/a 012200324021002000000
Legal Description: Lot 5, and the East 1/2 Lot 4, Block 15, according to the Shady Side, as recorded in Map Book 6, Page 38, in the Probate Office of Jefferson County, Alabama a/k/a LOT 5 and E 1/2 LOT 4 BLK 15
SHADYSIDE
ANY PERSON WITH A PROPERTY INTEREST IN THE ABOVE PROPERTY IS HEREBY NOTIFIED THAT THEY MAY LOSE SUCH INTEREST, IF ANY, AS A RESULT OF THE ABOVE-REFERENCED QUIET TITLE AND FORECLOSURE ACTION. The judgment of the Court may result in title to the property vesting in the Birmingham Land Bank Authority. Any person who proves to the Court’s satisfaction a right to redeem the property pursuant to Alabama Code 1975 §§ 40-10-83, et seq. may redeem the property pursuant to those statutes within five (5) days after the appropriate Order on Final Hearing is issued. FAILURE TO REDEEM THE PROPERTY AND PRESENT PROOF OF REDEMPTION TO THE CIRCUIT COURT WITHIN THE FIVE-DAY PERIOD MAY RESULT IN A LOSS OF THE RIGHT OF REDEMPTION. The address of the Birmingham Land Bank Authority is City Hall, 710 20th Street North, Birmingham, Alabama 35203 and may be contacted care of the City of Birmingham Law Department at 205-254-2117.
IT IS THEREFORE ORDERED by the undersigned Clerk of Court that publication of this notice be made once a week for three consecutive weeks in the Birmingham Times, a newspaper of general circulation in Jefferson County, Alabama, and that all persons to whom this notice is addressed and any and all persons claiming any title to, interest in, or lien or encumbrance on the above-described land or any part thereof are hereby directed to plead, answer or otherwise respond to the Complaint in this cause before the hearing date or a judgment by default may be rendered against them it being intended that this notice shall be used to perfect service against all parties who cannot be personally served with a copy of the Complaint.
Dated this the 23rd day of December, 2024.
Jacqueline Anderson Smith, Circuit Clerk
BT01/02/2025
______________________________
CASE NO. CV-2024-904720.00
THE BIRMINGHAM LAND BANK AUTHORITY, a Public Corporation,
NOTICE OF FINAL HEARING BY PUBLICATION
TO: RICHARD L. MCKIBBEN, SR.; LLOYD CECIL FREY and PAUL RAYMON FREY, as heirs of SARAH B. FREY; UNKNOWN HEIRS OF SARAH B. FREY; CITY OF TARRANT, ALABAMA; THE BAK OF NEW YORK MELLON TRUST COMPANY, NATIONAL ASSOCIATION; J.T. SMALLWOOD, JEFFERSON COUNTY TAX COLLECTOR; JEFFERSON COUNTY, ALABAMA; CITY OF BIRMINGHAM, ALABAMA; and any and all other unknown heirs, claimants or interested parties claiming any right, title, estate, lien, or interest in the real estate described herein,
TAKE NOTICE that on November 20, 2024, the Birmingham Land Bank Authority filed the above-styled Complaint, and the Land Bank asserts that it has recorded notice of a pending quiet title and foreclosure action in the Probate Court of Jefferson County, Alabama concerning the rights and/or interests in the following real property:
Address: 1016 Waverly Street, Birmingham, Alabama 35217
Tax Parcel ID No.: 01-23-00-08-1-019-040.000
Legal Description: Lots 20, 21 and 22, Block 10, according to the Survey of Oak Park, as recorded in Map Book 9, Page 85, in the Probate Office of Jefferson County, Alabama, being situated in Jefferson County, Alabama (It appears said legal is the same as that certain legal described in Instrument No. 2017097463 as follows: LOT 20 & 21 & 22 BLK 10 OAK PARK)
ANY PERSON WITH A PROPERTY INTEREST IN THE ABOVE PROPERTY IS HEREBY NOTIFIED THAT THEY MAY LOSE SUCH INTEREST, IF ANY, AS A RESULT OF THE ABOVE-REFERENCED QUIET TITLE AND FORECLOSURE ACTION. The final hearing on this quiet title and foreclosure action is hereby set for February 21, 2025, in Room 340, Jefferson County Courthouse in Birmingham, Alabama at 9:00 A.M. The judgment of the Court may result in title to the property vesting in the Birmingham Land Bank Authority. Any person who proves to the Court’s satisfaction a right to redeem the property pursuant to Alabama Code §§ 40-10-73 (1975) et seq. or Alabama Code §§ 40-10-83 (1975) et seq. may redeem the property pursuant to those statutes within five (5) days after the appropriate Order on Final Hearing is issued. FAILURE TO REDEEM THE PROPERTY AND PRESENT PROOF OF REDEMPTION TO THE CIRCUIT COURT WITHIN THE 5-DAY PERIOD MAY RESULT IN A LOSS OF THE RIGHT OF REDEMPTION.
The address of the Birmingham Land Bank Authority is City Hall, 710 North 20th St., Birmingham, AL 35203. The Birmingham Land Bank Authority may be contacted care of Cherokee W. Wooley, Law Offices of Thomas J. Skinner, IV, LLC, at (205) 802-2545.
IT IS THEREFORE ORDERED by the undersigned Clerk of Court that publication of this notice be made once a week for three consecutive weeks in the Birmingham Times, a newspaper of general circulation in Jefferson County, Alabama, and that all persons to whom this notice is addressed and any and all persons claiming any title to, interest in, or lien or encumbrance on the above-described land or any part thereof are hereby directed to plead, answer or otherwise respond to the Complaint in this cause before the hearing date or a judgment by default may be rendered against them it being intended that this notice shall be used to perfect service against all parties who cannot be personally served with a copy of the Complaint.
Dated this the 23rd day of December, 2024.
Jacqueline Anderson Smith, Circuit Clerk
BT01/02/2025
______________________________
Blountsville Housing Authority
REQUEST FOR PROPOSALS
for
LAWN CARE SERVICES
PUBLIC NOTICE is hereby given that proposals will be received by Blountsville Housing Authority to procure experienced, qualified, licensed and bonded, professional Lawn Care Services.
Date and Time for Receiving Proposals:
Monday, February 03, 2025 by 3:00 p.m. CST
At
Blountsville Housing Authority
Attention: Brad Ashley
Executive Director
293 Denson Avenue
Boaz, AL 35957
The Housing Authority anticipates that it will initially award a contract for a period of one (1) year with the option, at the Authority’s discretion, of four (4) additional one-year option periods, for a maximum total of five (5) years. The Authority reserves the right to waive any informalities in proposals and to reject any and all proposals if it is in the best interest of the Authority to do so. To obtain the Request for Proposals (RFP) documents, contact the Contract Officer at brad.ashley@hiwaay.net and request documents. Please identify the project name listed above. You must also provide your company name, address, person of contact, phone number, and email address.
BT01/02/2025
______________________________
ADVERTISEMENT for BIDDER PRE-QUALIFICATION
And NOTICE of INTENT to RECEIVE BIDS
from PREQUALIFIED BIDDERS
Pre-qualification submittals will be received by the Owner’s Representative/Project Manager, Chris Hodges on behalf of Office of the Chief Facilities Officer, UAB Medicine, University of Alabama at Birmingham, and the University of Alabama Board of Trustees at UAB Hospital Planning, 2020 University Blvd., Birmingham, AL 35249 until 4:00 PM Central Time, January 10, 2025. The original and two (2) flash drives with duplicates of submittals are required for pre-qualification approval; however, email transmission copies may be transmitted to the UAB Project Manager Chris Hodges at cjhodges@uabmc.edu and cc’d to sheywood@ghafari.com and mfreeman@ghafari.com to expedite the review process with a hard-copy of the submittal and two flash drives to be delivered within 24 hours.
UAB
Office Space Fit-Out Project
University of Alabama at Birmingham
Birmingham, Alabama
Project No.: H235023
A. SCOPE OF WORK:
The project consists of the fit-out of a 2,400 SF shell space for office use at UAB. The space will be comprised of a large open office and support office space, breakroom, and new data closet. The scope of work includes architectural, interiors, electrical, and mechanical new work. The construction budget is anticipated to be between $1,000,000 and $1,100,000.
The work will be performed under a single Prime General Contractor who will coordinate the work of this project. Particular and specific care will be required to coordinate complex shutdowns, limit disturbances and follow strict Infection Controls and Interim Life Safety Measures (ICRA/ILSM) requirements for the protection of patients, family and staff. The Prime General Contractors seeking to be pre-qualified will require experience with similar size and type hospital projects performed in and adjacent to an operating hospital environment and with the implementation and maintenance of infection control measures, interim life safety measures, coordinating shutdowns, and maintaining a clean and organized job site in an operating hospital. The General Contractor must have experience with representative projects as a General Contractor (not as a Construction Manager, Program Manager, etc.)
B. PRIME GENERAL CONTRACTOR BIDDER PRE-QUALIFICATIONS:
Prime General Contractor bidders interested in submitting a proposal must apply for pre-qualification and must be licensed under the Provision of Title 34, Chapter 8, and Code of Alabama, 1975. A copy of current Alabama Contractors license is to be included in pre-qualification submittal.
Only bidders who have completed the pre-qualification process and that have been approved will be eligible to submit a bid for the Project. Prospective Bidder’s Pre-qualification Package must be received by the Owner’s Project Manager no later than 4:00 PM Central Time, January 10, 2025 after which no further requests will be considered.
Pre-qualification Requirements Information Package may be obtained from the Architect upon letterhead request sent by email or scanned into an email to sheywood@ghafari.com, copy mfreeman@ghafari.com and cjhodges@uabmc.edu. Any addenda to the prequalification requirements will be issued to documented prime contractors only.
The pre-qualification procedure is intended to identify responsible and competent prime contractor bidders relative to the requirements of the Project. Each prospective prime contractor bidder will be notified of the results of the pre-qualification, on or about January 17, 2025.
The Owner reserves the right to waive technical errors in applications, extend or abandon the pre-qualification process, should the interests of the Owner appear to be promoted thereby.
Progress Design and Construction Documents:
Prior to the pre-qualification deadline, project progress plans and specifications may be examined at the following location beginning January 17, 2025:
Architect:
Ghafari Associates
2170 Highland Ave S
Suite 220
Birmingham, AL 35205
Phone: 205-203-4611
Contact: Scott Heywood
Email: sheywood@ghafari.com
C. BIDS BY PRE-QUALIFIED PRIME GENERAL CONTRACTOR BIDDERS
Documents:
Bid documents will be available at the following locations after notice to pre-qualified bidders is given. Drawings and specifications may be examined at; ALGX Digital Plan Room, http://www.algraphics.com, 2801 5th Ave, South, Birmingham, AL 35233: Dodge Data & Analytics, http://www.construction.com, 2860 S State Hwy 161, Ste 160 #501, Grand Prairie, TX 75052-7361; at the AGC Internet Plan Room, 5000 Grantswood Road Suite 100, Irondale, AL 35210; at the Birmingham Construction Industry Authority, http://www.bcia1.org, 601 37th Street South, Birmingham, AL 35222; and at the Construction Market Data, http://www.cmdgroup.com, 30 Technology Pkwy, South, Suite 500, Norcross, GA 30092-2912.
Bonds:
A certified check or bid bond payable to the University of Alabama at Birmingham in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000 must accompany the bidder’s proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract.
Bids:
Bids must be submitted on proposal forms or copies thereof furnished by the Architect. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject bids if such action is determined to be in the best interest of the Owner. The Owner reserves the right to revoke pre-qualification of any bidder in accordance with Section 39-2-12, Code of Alabama, 1975, as amended in 1997 (by Act 97-225). The Bid Date is February 06, 2025 at 2:00 PM Central Time at the University of Alabama at Birmingham, UAB Hospital Planning, 2020 University Blvd., Birmingham, Alabama 35294. Bids shall be clearly identified on the exterior of the package with the bidder’s name, address, State license number, the name of the project being bid, time and place of the bid opening. Sealed bids shall be properly identified.
On the date of the bid opening, bids may be hand delivered or received by Express Service mail to the Office of Chris Hodges, Project Manager Facilities and Capital Projects, 2020 Building, 2020 University Blvd, Birmingham, Alabama 35233, until 12:00 noon. After 12:00 noon of the date of the bid opening, proposals must be hand delivered and presented at the bid opening. Sealed proposals shall be submitted in triplicate and shall be properly identified. All proposals received after 2:00 p.m. on February 06, 2025 (the date and time set for the receipt of bids) will be returned unopened.
Nonresident Prime Contractor Bidders:
Under Section 39-3-5, Code of Alabama, 1975, nonresident prime contractor bidders must accompany any written bid documents with a written opinion of an attorney licensed to practice law in such nonresident prime contractor bidder’s state of domicile as to the preferences, if any or none, granted by the law of the state to its own business entities whose principal place of business are in that state in the letting of any or all public contracts. Resident prime contractors in Alabama, as defined in Section 39-2-12, are granted preference over nonresident prime contractors in awarding of contracts in the same manner and to the same extent as provided by the laws of the state of domicile of the nonresident.
Fire Alarm Work:
In accordance with Title 34, Chapter 33A (the ACT), of the Code of Alabama 1975, bidders for fire alarm work of this project, if any, must include with their bid evidence of licensure as required by the ACT by including with the bid submittal a valid State Fire Marshal’s permit.
D. PRE-BID CONFERENCE
A mandatory Pre-Bid Conference is currently scheduled to be held at 1:00 PM CST on January 22, 2025 at UAB Hospital Facilities 2020 Building, 2020 University Blvd., Birmingham, Alabama 35233. It is mandatory that all pre-qualified prime contractor bidders attend the Pre-Bid Conference.
BT01/02/2025
______________________________
ABANDONED VEHICLES
If these cars are not claimed in 30 days I will take legal ownership of the vehicles.
1 2006 Mercedes Benz CLS 500 Vin number WDDDJ75X96A030748
2 1990 Nissan XE pickup Vin number 1N65D1658VC368019
My contact number is 708-673-8007
BT01/02/2025
______________________________
THE WATER WORKS BOARD OF THE CITY OF BIRMINGHAM
SHADES MOUNTAIN FILTER PLANT SHORT-TERM
RESIDUALS HANDLING IMPROVEMENTS
Project Number: P.04380
Capital Budget Number: BP–664-24
NOTICE TO BIDDERS
Sealed Bids for the construction of the Shades Mountain Filter Plant Short-Term Residuals Handling Improvements Project will be received by The Water Works Board of the City of Birmingham Engineering Department, Attn: Hattye McCarroll. P.E.; Chief Engineer, 3600 First Avenue North, Birmingham, Alabama 35222 until 10:00 a.m. local time on February 6th, 2025. Bids received after said time will be rejected and returned unopened.
Construction of Shades Mountain Filter Plant Short-Term Residuals Handling Improvements Project includes but not limited to the following scope of work:
1. Mobilization and demobilization.
2. Perform demolition work as indicated in the drawings.
3. Furnish and install automated isolation plug valves on existing 8” auger drain lines for both centrifuges.
4. Install OWNER’s procured motorized actuators on the diverter valves in the basement.
5. Upsize the sump pumps and associated piping, valves and appurtenances in the basement sump pit.
6. Create new sump pit in the basement between the truck containment area and the rollup door along with required submersible pump and piping.
7. Upsize the sump pumps and associated piping, valves and appurtenances in the wet well next to Thickener No.1.
8. Furnish and install new conveyors system, including inclined conveyors, offload conveyors, with interconnecting chutes and the supports of all equipment.
9. Create a new offload bay in the basement, including a hopper with supports, a new opening on the north wall with motorized roll-up door installed, retaining wall, and concrete driveway connecting to the existing roadway.
10. Re-route service water, drain and electrical utility lines as indicated in the drawings.
11. Furnish and install new air compressor in the operation floor.
12. Furnish and install new HVAC system in the operating floor and basement with the associated monitoring and alarm systems.
13. PLC upgrade for the existing centrifuge control panels.
14. Electrical, instrumentation and controls, and integration with SCADA associated with the above-mentioned work.
Bids shall be based on a lump sum plus unit price items plus contingency allowance items as indicated in the Bid Form.
Bidding Documents may be examined at the office of the Chief Engineer of The Water Works Board of the City of Birmingham, 3600 First Avenue North, Birmingham, AL; and the office of Arcadis U.S., Inc., 1143 1st Ave. South, Suite 109, Birmingham, AL.
Prime Contractor bidders may obtain one complete set of Bidding Documents on or after December 9th, 2024 from the office of the Chief Engineer of The Water Works Board of the City of Birmingham upon payment of a $300.00 deposit by company check or by certified check and signing a nondisclosure statement. No personal checks or any other form of payment except as noted will be accepted. This deposit shall be refunded in full to each prime contractor bidder upon the return of the Bidding Documents in a reusable condition within 10 days after the bid opening. Additional sets of Bidding Documents for prime contractor bidders, subcontractors, vendors or dealers may be obtained upon payment of said $300.00 deposit and signing a nondisclosure statement. This deposit shall be refunded less the costs of printing, reproduction, handling, and distribution, upon return of the documents in reusable condition within 10 days after the bid opening. Company check or Certified check for documents shall be made payable to The Water Works Board of the City of Birmingham, 3600 First Avenue North, Birmingham, Alabama, 35222 and mailed to the Attn: Hattye McCarroll P.E.; Chief Engineer. No additional charge will be made for delivery via UPS ground. Those requesting shipment of documents via carriers other than UPS ground will be made at the requesting firm’s expense. Partial sets of Bidding Documents will not be available to any Bidder. Neither the OWNER nor the ENGINEER will be responsible for full or partial sets of Bidding Documents, including any addenda obtained from other sources. No Bidder may withdraw or alter a bid within 60 calendar days after the actual date of the bid opening.
A mandatory pre-bid conference and site visit will be held at 9:00 a.m. local time on January 14th, 2025 at Shades Mountain Filter Plant, located at 2990 Shades Crest Rd, Vestavia Hills, AL 35216. All prospective Bidders and interested parties are required to attend the pre-bid conference. The purpose of the pre-bid conference is to raise questions pertaining to the Bidding and Contract documents and for the OWNER or its representatives to clarify any points. HUB Resource Engagement Form (HUB Form 3) must be completed and included with all sealed bids for construction contracts with the BWWB. Bids will NOT BE ACCEPTED from any Prospective Bidder who does not attend the mandatory Pre-Bid Conference.
Each bid shall be accompanied by a cashier’s check, drawn on an Alabama Bank, or bid Bond in the amount of five percent (5%) of the bid not to exceed $50,000.00 in the form and subject to conditions provided for in the Specifications.
The successful Bidder will be required to furnish a Performance Bond and a Payment Bond each in an amount equal to 100 percent of the Contract Award.
Bidders shall comply with all statutory requirements in accordance with the Instructions to Bidders. Bids will only be received from Contractors who are licensed by the State of Alabama. Contract time of commencement and completion will be in accordance with the Agreement.
The Water Works Board of the City of Birmingham (“BWWB”) has adopted a voluntary Historically Underutilized Business (“HUB”) Program designed to encourage the participation of HUB firms in construction projects. To that end, the BWWB will never exclude any firm from participation in, deny any person benefits of, or otherwise discriminate in connection with the award and performance of BWWB contracts based on racial, gender, social, or economic status.
It is the intent of the BWWB to foster competition among contractors, suppliers and vendors that will result in better quality and more economical services for the BWWB. Under this program, the BWWB has established a goal of 30% participation of HUB firms for services required for BWWB construction projects. The BWWB’s stated goal will not be the determining factor in construction contract awards; rather bidders must demonstrate compliance with the Good Faith Efforts, more particularly outlined in the HUB Program, toward meeting said goal.
Failure on the part of a bidder to fully submit the information required herein may be considered by the BWWB in evaluating whether the bidder is responsive to bid requirements.
Alabama Code §31-13-9 (1975) provides that as a condition for the award of any contract by The Water Works Board of the City of Birmingham, a business entity or employer that employs one or more employees within the state of Alabama shall provide documentation of enrollment in the E-Verify program.
Each Prospective Bidder must complete, as a condition for the award of any Contract by The Water Works Board of the City of Birmingham, the Certification Regarding Debarment in Section 00 20 10. The Certification must be complete in its entirety and must be included with the Prospective Bidder’s Bid (NO EXCEPTIONS).
The legislature of Alabama Act 2013-205 grants the Alabama Department of Revenue (ADOR) the authority to issue certificates of exemption from sales and use taxes for construction projects for certain governmental agencies. Pursuant to Act 2013-205, Section 1(g) the Contractor accounts for the sales tax not included in the Bid Form by submitting an Accounting of Sales Tax-Attachment to BWWB Bid Form. Failure to provide an accounting of sales tax shall render the bid non-responsive. Other than determining responsiveness, sales tax accounting shall not affect the bid pricing nor be considered in the determination of the lowest responsible and responsive bidder. After Notice of Award, Contractor and Subcontractor licensed by the State Licensing Board for General Contractors must comply with ADOR requirements for making an application for qualification of the exemption and are responsible for ADOR reporting requirements for the duration of the project.
If a Contract is to be awarded, it will be awarded to the Bidder with the best price on the best terms for the OWNER, who has neither been disqualified nor rejected pursuant to these Contract Documents, and whose Bid based on an evaluation by the OWNER indicates that the award will be in the best interest of the Project and will result in the lowest overall cost to the OWNER for completion of the project. If a Contract is to be awarded, it will be awarded within 90 calendar days after the day of the opening of bids.
The OWNER reserves the right to reject any and all proposals, the right to waive irregularities or to accept any proposal deemed to be in the best interest of the OWNER.
Owner:
The Water Works Board of the City of Birmingham
3600 First Avenue North
Birmingham, Alabama 35222
Chief Engineer Hattye McCarroll, P.E
Phone number (205) 244-4182
Engineer:
ARCADIS, U.S., Inc.
1143 1st Ave South, Suite 109
Birmingham, Alabama 35233
Yahya Majali, P.E
Phone number (205) 545-1504
BT010/2/2025
______________________________
NOTICE OF COMPLETION
In accordance with Chapter 1, Title 39, Code of Alabama, 1975, as amended, notice is hereby given
Shelby Company LLC, Contractor, has completed the Contract for Construction of UAB New Student Organization Facility at 1330 11th Avenue South Birmingham, AL 35205 for the State of Alabama and the
City of Birmingham, Owner(s), and have made request for final settlement of said Contract. All persons
having any claim for labor, materials, or otherwise in connection with this project should immediately notify
ArchitectureWorks, Architect / Engineer.
Shelby Company LLC
Contractor
3120 4th Avenue South
Birmingham, AL 35233
BT01/02/2025
______________________________
INVITATION TO BID
Sealed Bids for construction of the PAUL B. KREBS WATER TREATMENT PLANT IMPROVEMENTS will be received at the office of The Water Works and Sewer Board of Anniston, Alabama, (Owner), 1429 Noble Street, Anniston, AL 36201, until 10 a.m., local time, on Thursday, February 13, 2025. Any Bids received after the specified time will not be considered.
Bids will then be publicly opened and read.
The Project contemplated consists, but is not limited, to the following items:
1. Base Bid
a. Installation of new finished water pump station.
i. Replace all existing finished water pumps with five new canned vertical turbine pumps.
ii. Install space and pump cans for two future vertical turbine pumps to serve the distribution system downstream.
iii. Construct new finished water pump station to house the new vertical turbine pumps south of the existing finish water pump station. The new pump station shall be constructed with individual cans per each pump housing the vertical turbine pumps. This includes the corresponding check valves, isolation valves, air release valves, and instrumentation as required. The pumps and corresponding pipe headers will be located within the building.
iv. Demolition of the existing maintenance building and modifications to surrounding area as required to allow for construction of the new finished water pump station and electrical building.
v. Installation of pneumatic surge tank and corresponding compressors, instrumentation, sensors, and appurtenances.
vi. Installation of all new yard piping for connection of existing clearwell effluent piping to the new finished water pump station and the pump station discharge piping to the connection of the plants high service distribution system piping. Yard piping installation will include tie-ins, flow meters, and valves.
b. Installation of electrical and SCADA upgrades.
i. Installation of new 277/460V-3-phase power service to replace exiting radial-type distribution power.
ii. Installation of two new on-site standby generators and paralleling switchgear with isolated/redundant main distribution buses and two separate utility service laterals.
iii. Update half of the existing main plant process loads currently fed from existing MCC-A to be fed from a new redundant MCC-A2.
iv. Construct new electrical room within the new finished water pump station to house new electrical gear for the facility including new electrical gear for finished water pump station and generators.
v. Replace existing lighting with new, energy-efficient LED lighting systems throughout the interior and exterior of the plant.
vi. Upgrade SCADA with a new RTU in the new finished water pump station.
c. Fluoride Tank Containment Area and Supports
i. Construction of containment area and tank supports for the new client- provided fluoride tank. This shall include instrumentation, level sensors, loading station, emergency shower and eyewash, and all chemical piping to connect to the existing system.
d. Spring Basin and Containment Wall
i. Provide waterproofing and repair of the existing Coldwater Spring retaining wall and concrete valley gutters to mitigate surface stormwater short circuiting into the spring.
e. Clearwell/Chlorine Contact Basin Repairs
i. Repair of collapsed baffle wall. Demolish approximately half of the wall length and reconstruct based on original details. Inspect floor at baffle wall failure location and repair.
ii. Clean all silt from clearwell floor, inspect for cracks or damage, and repair.
iii. Repair two concrete pilasters.
iv. Seal cracks in exterior dome roof and coat exterior.
v. Repair cracks in interior clearwell walls.
vi. Provide new exterior and interior coating system.
vii. Repair interior dome roof. Coat and repair exposed wire mesh and rebar. Provide interior coating of surface to prevent future exposure and deterioration.
f. General Site Work
i. New loop road to improve access around the site for maintenance and chemical deliveries.
ii. Demolition of existing entrances and installation of new entrance gate and site fencing.
iii. All stormwater and erosion control measures as required.
iv. Provide site grading and stormwater system improvements per contract documents.
v. Demolition of existing asphalt wearing surface and installation of new wearing surface as indicated in contract documents.
2. Additive Bid Alternative 1: Replace and Repair Existing Air Stripping Towers
a. Portions of each existing Air Stripping Towers (6 Total) to be replaced:
i. 24 vertical feet of 3.5-inch Jaeger Tripack Packing Media (2500 cf).
ii. Two flanged aluminum shell sections above tower packing to be replaced with 304 SS Construction.
iii. 4 screen air outlet screens on the tower shell above the mist eliminator.
iv. Flanged access doors.
v. Polypropylene mesh mist eliminator with support and hold-down. The mist eliminator is 4-inch thick, 138-inch diameter polypropylene mesh.
3. Additive Bid Alternative 2: Installation of new Air Stripping Tower
a. Installation of new Air Stripping Tower with corresponding blower, valves, piping, instrumentation, sensors and appurtenances.
4. Additive Bid Alternative 3: Replace existing Main DFS control panel with latest generation DFS control panel.
a. Replace the existing Main DFS control panel in the existing finished water pump station electrical room with a latest generation DFS control panel to include minimum 50 percent more I/O of each signal type. All existing signals will be re-terminated in the new control panel with minimal disruption to plant operations.
The Work will be substantially completed within 840 days and completed in all respects within 900 calendar days from the date when the Contract Times commence to run.
Bidding Documents may be examined in Engineer’s office, Jacobs, 1 Perimeter Park South, Suite 315N, Birmingham, Alabama 35243. Electronic Bidding Documents may be viewed and downloaded by registering with QuestCDN online at www.questcdn.com. To view and download digital documents for this project at QuestCDN.com, login or sign up for a free membership within the website’s Bidders Tab. Navigate to the digital bidding documents by inputting the Quest Project No. 9449419 on the Project Search page. The digital bidding documents can be viewed for free or downloaded for a non-refundable charge of $22. Any addenda will be posted digitally on the project’s website via QuestCDN.com. No partial sets, individual pages, or drawing sheets will be provided.
Each Bid must be submitted on the prescribed Bid Form and accompanied by Bid security as prescribed in the Instructions to Bidders.
The Successful Bidder will be required to furnish the additional bond(s) and insurance prescribed in the Bidding Documents.
The Owner will only accept Proposals from contractors duly licensed by the Alabama State Licensing Board for General Contractors as required by applicable Alabama law, including without limitation Ala. Code § 34-8-1, et seq., Bidders’ Alabama General Contractor License Number shall appear on the outside of the envelope containing such bid prior to opening.
For information concerning the proposed Work, contact Dustin Harris, Jacobs, 205-960- 3788.
Attendance at a prebid conference will be a mandatory requirement of submitting a Bid for this Project. The mandatory prebid meeting will be held on Wednesday, January 15, 2025, at 10:00 a.m. at the Anniston Water Works and Sewer Board’s office located at 1429 Noble St., Anniston, AL 36201.
Owner’s right is reserved to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents.
In compliance with the BEASON-HAMMON ALABAMA TAXPAYER AND CITIZEN ACT, the successful bidder will be required to submit proof of Immigration Compliance as the law applies. The following language is required by § 31- 13-9 (k) Code of Alabama 1975 to be placed in all contracts covered by the Act: “By signing this contract, the contracting parties affirm, for the duration of the agreement, that they will not violate federal immigration law or knowingly employ, hire for employment, or continue to employ an unauthorized alien within the state of Alabama. Furthermore, a contracting party found to be in violation of this provision shall be deemed in breach of the agreement and shall be responsible for all damages resulting therefrom.”
The Water Works and Sewer Board of the City of Anniston, Alabama
Clif Osborne Project Manager
BT01/02/2025
______________________________
ADVERTISEMENT for BIDDER PRE-QUALIFICATION
And NOTICE of INTENT to RECEIVE BIDS
from PREQUALIFIED BIDDERS
Pre-qualification submittals will be received by the Owner’s Representative/Project Manager, Chris Hodges, on behalf of Office of the Chief Facilities Officer, UAB Medicine, University of Alabama at Birmingham, and the University of Alabama Board of Trustees at UAB Hospital Planning, 2020 University Blvd., Birmingham, AL 35294 until 4:00 PM CDST, Friday, January 10th, 2025. The original and two (2) flash drives with PDF duplicates of submittals are required for pre-qualification approval; however, email transmission copies in PDF format may be transmitted to the UAB Project Manager at cjhodges@uabmc.edu and cc’d the Architect at varuni.kern@greshamsmith.com to expedite the review process with a hard-copy of the submittal and two flash drives to be delivered within 24 hours.
UAB ED EXPANSION – PHASE 0
FOR THE UAB HOSPITAL
At The
University of Alabama at Birmingham
1802 SIXTH AVENUE SOUTH, BIRMINGHAM, ALABAMA 35233
UAB PROJECT # H245001
SCOPE OF WORK:
The Project consists of the interior renovation of an existing Low Acuity patient treatment area on the first floor of the existing UAB Hospital Emergency Department. The renovated space will become a temporary waiting room for the Emergency Department. The scope of work is approximately 1,675 sf.
The work will be performed under a single Prime General Contractor who will coordinate the work of this project. The work will be performed adjacent to and within an operational Hospital and Emergency Department. Particular and specific care will be required to limit disturbances, coordinate shutdowns, and follow strict Infection Controls and Interim Life Safety Measures (ICRA/ILSM) requirements for the protection of patients, family and staff. The Prime General Contractors seeking to be pre-qualified will require experience with similar size and type hospital projects performed in and adjacent to an operating hospital environment and with the implementation and maintenance of infection control measures, interim life safety measures, coordinating shutdowns, and maintaining a clean and organized job site in an operating hospital. The General Contractor must have experience with representative projects as a General Contractor (not as a Construction Manager, Program Manager, etc.)
The estimated construction cost is between $400,000 and $500,000.
A. PRIME GENERAL CONTRACTOR, MECHANICAL SUBCONTRACTOR (HVAC), PLUMBING SUBCONTRACTOR, AND ELECTRICAL SUBCONTRACTOR BIDDER PRE-QUALIFICATIONS:
Prime General Contractor bidders interested in submitting a proposal must apply for pre-qualification and must be licensed under the Provision of Title 34, Chapter 8, and Code of Alabama, 1975. A copy of current Alabama Contractors license is to be included in pre-qualification submittal.
Only bidders who have completed the pre-qualification process and that have been approved will be eligible to submit a bid for the Project. Prospective Bidder’s Pre-qualification Package must be received by the Owner’s Project Manager no later than 4:00 PM CDST, Friday, January 10th, 2025 after which no further requests will be considered.
Pre-qualification Requirements Information Package may be obtained from the Architect upon letterhead request sent by email or scanned into an email to Theresa.Ashley@greshamsmith.com, copy varuni.kern@greshamsmith.com and cjhodges@uabmc.edu. Any addenda to the prequalification requirements will be issued to documented prime contractors only.
The pre-qualification procedure is intended to identify responsible and competent prime contractor and subcontractor bidders relative to the requirements of the Project. Each prospective prime contractor will be notified of the results of the pre-qualification, on or about Wednesday, January 15th, 2025.
The Owner reserves the right to waive technical errors in applications, extend or abandon the pre-qualification process, should the interests of the Owner appear to be promoted thereby.
Progress Design and Construction Documents:
Prior to the pre-qualification deadline, project progress plans and specifications may be examined at the following location:
Architect:
Gresham Smith,
2222 Arlington Ave South, Suite 202,
Birmingham, AL 35205
Phone: 205-298-9200
BIDS BY PRE-QUALIFIED PRIME GENERAL CONTRACTOR BIDDERS
Documents:
Bid documents will be available at the following locations after notice to pre-qualified bidders is given. Drawings and specifications may be examined at; ALGX Digital Plan Room, http://www.algraphics.com, 2801 5th Ave, South, Birmingham, AL 35233: Dodge Data & Analytics, http://www.construction.com, 2860 S State Hwy 161, Ste 160 #501, Grand Prairie, TX 75052-7361; at the AGC Internet Plan Room, 5000 Grantswood Road Suite 100, Irondale, AL 35210; at the Birmingham Construction Industry Authority, http://www.bcia1.org, 601 37th Street South, Birmingham, AL 35222; and at the Construction Market Data, http://www.cmdgroup.com, 30 Technology Pkwy, South, Suite 500, Norcross, GA 30092-2912.
Bonds:
A certified check or bid bond payable to the University of Alabama at Birmingham in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000 must accompany the bidder’s proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract.
Bids:
Bids must be submitted on proposal forms or copies thereof furnished by the Architect. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject bids if such action is determined to be in the best interest of the Owner. The Owner reserves the right to revoke pre-qualification of any bidder in accordance with Section 39-2-12, Code of Alabama, 1975, as amended in 1997 (by Act 97-225). The Bid Date is currently scheduled for Thursday, January 30th, 2025 at 2:00 PM CDST at the University of Alabama at Birmingham, UAB Hospital Planning, 2020 University Blvd., Birmingham, Alabama 35294. Bids shall be clearly identified on the exterior of the package with the bidder’s name, address, State license number, the name of the project being bid, time and place of the bid opening. Sealed bids shall be properly identified.
On the date of the bid opening, bids may be hand delivered or received by Express Service mail to the Office of Chris Hodges, Project Manager, Facilities and Capital Projects, 2020 Building, 2020 University Boulevard, Birmingham, Alabama, 35249, until 12:00 Noon. After 12:00 Noon of the date of the bid opening proposals must be hand delivered and presented at the bid opening. Sealed proposals shall be submitted in triplicate and shall be properly identified. All proposals received after 2:00 P.M. on November 19th, 2024, (the date and time set for the receipt of bids) will be returned unopened.
Nonresident Prime Contractor Bidders:
Under Section 39-3-5, Code of Alabama, 1975, nonresident prime contractor bidders must accompany any written bid documents with a written opinion of an attorney licensed to practice law in such nonresident prime contractor bidder’s state of domicile as to the preferences, if any or none, granted by the law of the state to its own business entities whose principal place of business are in that state in the letting of any or all public contracts. Resident prime contractors in Alabama, as defined in Section 39-2-12, are granted preference over nonresident prime contractors in awarding of contracts in the same manner and to the same extent as provided by the laws of the state of domicile of the nonresident.
Fire Alarm Work
In accordance with Title 34, Chapter 33A (the ACT), of the Code of Alabama 1975, bidders for fire alarm work of this project, if any, must include with their bid evidence of licensure as required by the ACT by including with the bid submittal a valid State Fire Marshall’s permit.
B. PRE-BID CONFERENCE
A mandatory Pre-Bid Conference is currently scheduled to be held on Friday, January 17th, 2025 at 9:00 a.m. at UAB Hospital Facilities 2020 Building, 2020 University Blvd., Birmingham, Alabama 35233. It is mandatory that all pre-qualified prime contractor bidders attend the Pre-Bid Conference.
BT01/02/2025
______________________________
THE WATER WORKS BOARD OF THE CITY OF BIRMINGHAM
CANE CREEK BOOSTER PUMPING STATION PLC UPGRADE
Project Number: P.04412 Capital Budget Number: BP-663-24
NOTICE TO BIDDERS
Sealed Bids for the construction of the Cane Creek Booster Pumping Station PLC Upgrade project will be received by The Water Works Board of the City of Birmingham Engineering Department, Attn: Hattye McCarroll. P.E.; Chief Engineer, 3600 First Avenue North, Birmingham, Alabama 35222 until 10:00 a.m. local time on January 23rd, 2025. Bids received after said time will be rejected and returned unopened.
Construction of Cane Creek Booster Pumping Station PLC Upgrade Project includes but not limited to the following scope of work:
1. Modify existing 3-door cabinet Pump Control Panel while keeping the left side panel and controls in service.
2. Replace PLC-5 processors, associated IO, and associated software with new redundant ControlLogix in the existing Pump Control Panel in the right hand side, and in the Flow Control Panel. Translate existing documented PLC-5 control narrative, program and test in ladder logic algorithm suitable for ControlLogix in redundant application.
3. Retain the services of Schneider Electric for Multilins Panel PLC upgrade and communication protocol upgrade with the existing Foxboro DCS and removing existing communication module.
4. Provide training seats and programming software for Rockwell hardware as specified.
5. Modify Pump Control Panel structure (existing doors) by replacing existing Redi-Panels with a single Panelview Plus 7 on right hand side and provide a programmed spare.
6. Replace all three front doors of existing Pump Control Panel.
7. Following sequence to maintain operation of station, remove existing drum switches, chart recorders, and communication converter and return to OWNER.
8. Field verification of wires in & out of service. Remove any unused wires within right, left, and center cabinets.
9. Review all field conditions, confirm functions, replacement components, and confirm field I/O wiring and labeling.
10. Fully test operation of new PLC prior to continuing demolition of left side controls. Make provisions to maintain operation of the pump station as required to facilitate a graceful cutover from old to new control system.
11. Provide drawings depicting as-built state of the ControlLogix hardware, IO wiring, network architecture, etc. and provide editable copies of PLC program in native format.
12. Replace existing Pump Control Panel overhead panel lighting with LED & door activation switches.
13. Replace the existing two UPS with Eaton 3.1 kVA UPS.
14. Start-up and field-testing services.
15. Functionally test controls at completion of demolition.
Please refer to Section 40 61 13 – Process Control System General Provisions for detailed scope of work.
Bids shall be based on a lump sum plus Unit Price Items (if any) plus contingency allowance items as indicated in the Bid Form.
Bidding Documents may be examined at the office of the Chief Engineer of The Water Works Board of the City of Birmingham, 3600 First Avenue North, Birmingham, AL; and the office of Arcadis U.S., Inc., 1143 1st Ave. South, Birmingham, AL.
Prime Contractor bidders may obtain one complete set of Bidding Documents on or after December 16th, 2024 from the office of the Chief Engineer of The Water Works Board of the City of Birmingham upon payment of a $200.00 deposit by company check or by certified check and signing a nondisclosure statement. No personal checks or any other form of payment except as noted will be accepted. This deposit shall be refunded in full to each prime contractor bidder upon the return of the Bidding Documents in a reusable condition within 10 days after the bid opening. Additional sets of Bidding Documents for prime contractor bidders, subcontractors, vendors or dealers may be obtained upon payment of said $200.00 deposit and signing a nondisclosure statement. This deposit shall be refunded less the costs of printing, reproduction, handling, and distribution, upon return of the documents in reusable condition within 10 days after the bid opening. Company check or Certified check for documents shall be made payable to The Water Works Board of the City of Birmingham, 3600 First Avenue North, Birmingham, Alabama, 35222 and mailed to the Attn: Hattye McCarroll P.E.; Chief Engineer. No additional charge will be made for delivery via UPS ground. Those requesting shipment of documents via carriers other than UPS ground will be made at the requesting firm’s expense. Partial sets of Bidding Documents will not be available to any Bidder. Neither the OWNER nor the ENGINEER will be responsible for full or partial sets of Bidding Documents, including any addenda obtained from other sources. No Bidder may withdraw or alter a bid within 60 calendar days after the actual date of the bid opening.
A mandatory pre-bid conference and site visit will be held at 9:00 a.m. local time on January 7th, 2025 at Cane Creek Booster Pumping Station, located at 6786 Water Works Rd, Mt Olive, AL 35117. All prospective Bidders and interested parties are required to attend the pre-bid conference. The purpose of the pre-bid conference is to raise questions pertaining to the Bidding and Contract documents and for the OWNER or its representatives to clarify any points. HUB Resource Engagement Form (HUB Form 3) must be completed and included with all sealed bids for construction contracts with the BWWB. Bids will NOT BE ACCEPTED from any Prospective Bidder who does not attend the mandatory Pre-Bid Conference.
Each bid shall be accompanied by a cashier’s check, drawn on an Alabama Bank, or bid Bond in the amount of five percent (5%) of the bid not to exceed $50,000.00 in the form and subject to conditions provided for in the Specifications.
The successful Bidder will be required to furnish a Performance Bond and a Payment Bond each in an amount equal to 100 percent of the Contract Award.
Bidders shall comply with all statutory requirements in accordance with the Instructions to Bidders. Bids will only be received from Contractors who are licensed by the State of Alabama.
Contract time of commencement and completion will be in accordance with the Agreement.
The Water Works Board of the City of Birmingham (“BWWB”) has adopted a voluntary Historically Underutilized Business (“HUB”) Program designed to encourage the participation of HUB firms in construction projects. To that end, the BWWB will never exclude any firm from participation in, deny any person benefits of, or otherwise discriminate in connection with the award and performance of BWWB contracts based on racial, gender, social, or economic status.
It is the intent of the BWWB to foster competition among contractors, suppliers and vendors that will result in better quality and more economical services for the BWWB. Under this program, the BWWB has established a goal of 30% participation of HUB firms for services required for BWWB construction projects. The BWWB’s stated goal will not be the determining factor in construction contract awards; rather bidders must demonstrate compliance with the Good Faith Efforts, more particularly outlined in the HUB Program, toward meeting said goal.
Failure on the part of a bidder to fully submit the information required herein may be considered by the BWWB in evaluating whether the bidder is responsive to bid requirements.
Alabama Code §31-13-9 (1975) provides that as a condition for the award of any contract by The Water Works Board of the City of Birmingham, a business entity or employer that employs one or more employees within the state of Alabama shall provide documentation of enrollment in the E-Verify program.
Each Prospective Bidder must complete, as a condition for the award of any Contract by The Water Works Board of the City of Birmingham, the Certification Regarding Debarment in Section 00 20
10. The Certification must be complete in its entirety and must be included with the Prospective Bidder’s Bid (NO EXCEPTIONS).
The legislature of Alabama Act 2013-205 grants the Alabama Department of Revenue (ADOR) the authority to issue certificates of exemption from sales and use taxes for construction projects for certain governmental agencies. Pursuant to Act 2013-205, Section 1(g) the Contractor accounts for the sales tax not included in the Bid Form by submitting an Accounting of Sales Tax-Attachment to BWWB Bid Form. Failure to provide an accounting of sales tax shall render the bid non-responsive. Other than determining responsiveness, sales tax accounting shall not affect the bid pricing nor be considered in the determination of the lowest responsible and responsive bidder. After Notice of Award, Contractor and Subcontractor licensed by the State Licensing Board for General Contractors must comply with ADOR requirements for making an application for qualification of the exemption and are responsible for ADOR reporting requirements for the duration of the project.
If a Contract is to be awarded, it will be awarded to the Bidder with the best price on the best terms
for the OWNER, who has neither been disqualified nor rejected pursuant to these Contract Documents, and whose Bid based on an evaluation by the OWNER indicates that the award will be in the best interest of the Project and will result in the lowest overall cost to the OWNER for completion of the project. If a Contract is to be awarded, it will be awarded within 90 calendar days after the day of the opening of bids.
The OWNER reserves the right to reject any and all proposals, the right to waive irregularities or to accept any proposal deemed to be in the best interest of the OWNER.
Owner:
The Water Works Board of the City of Birmingham 3600 First Avenue North
Birmingham, Alabama 35222
Chief Engineer Hattye McCarroll, P.E Phone number (205) 244-4182
Engineer:
ARCADIS, U.S., Inc.
2839 Paces Ferry Road SE Atlanta, GA 30339 Thomas Powell, PE, CCS
Phone number (470) 588-0451
BT01/02/2025
______________________________
ADVERTISEMENT for BIDDER PRE-QUALIFICATION And NOTICE of INTENT to RECEIVE BIDS
from PREQUALIFIED BIDDERS
Pre-qualification submittals will be received by the Owner’s Representative/Project Manager, Jeff Orr on behalf of Office of the Chief Facilities Officer, UAB Medicine, University of Alabama at Birmingham, and the University of Alabama Board of Trustees at UAB Hospital Planning, 2020 University Blvd., Birmingham, AL 35249 until 4:00 PM Central Time, Monday, January 17, 2025. The original and two (2) flash drives with duplicates of submittals are required for pre-qualification approval; however, email transmission copies may be transmitted to the Project Manager at jeorr@uabmc.edu and copied to rachelh@bparchitects.com to expedite the review process with a hard-copy of the submittal and two flash drives to be delivered within 24 hours.
UAB HIGHLANDS Domestic Hot water Repairs – Main For The
University of Alabama at Birmingham Birmingham, Alabama
UAB Project No.: H255007 Architect’s Project No. 069-23B
A. SCOPE OF WORK:
The scope of work includes the replacement of domestic hot water equipment and associated construction for the Main Mechanical Room on the 3rd floor of the UAB Highlands Building. This includes but is not limited to partition and concrete patching and plumbing work. Existing steam to hot water exchangers will be replaced and a modular mixing station will be installed to serve all floors in Main and Medical Office Building. Miscellaneous pipework to be completed. The work will be performed using Infection Control measures and the use of phasing may be utilized to minimize downtime. The project is located contiguous with fully functioning patient hospital and clinical areas and Contractors must have significant experience as a General Contractor in working in a hospital clinical environment and have knowledge and experience with implementation, monitoring, and maintaining Infection Control and Interim Life Safety Measures. This project will require significant coordination, working with the Owner’s representatives to successfully deliver the project. The anticipated dollar amount is approximately $900,000-950,000.
B. PRIME CONTRACTOR BIDDER PRE-QUALIFICATIONS:
Prime contractor bidders interested in submitting a proposal must apply for pre- qualification and must be licensed under the Provision of Title 34, Chapter 8, and Code of Alabama, 1975. A copy of current Alabama Contractors license is to be included in pre-qualification submittal.
Only prime contractor bidders who have completed the pre-qualification process and that have been approved will be eligible to submit a bid/perform work for the Project. Prospective Bidder’s Pre-qualification Package must be received by the Owner’s Project Manager no later than 4:00 PM Central Time, January 17, 2025 after which no further requests will be considered.
Pre-qualification Requirements Information Package may be obtained from the Architect upon letterhead request. Any addendums to the prequalification requirements will be issued to documented prime contractors only.
The pre-qualification procedure is intended to identify responsible and competent prime contractor bidders relative to the requirements of the Project. Each prospective prime contractor bidder will be notified of the results of the pre-qualification, on or about January 24, 2025.
The Owner reserves the right to waive technical errors in applications, or abandon the pre- qualification process, should the interests of the Owner appear to be promoted thereby.
Progress Design and Construction Documents:
Prior to the pre-qualification deadline, project progress plans and specifications may be examined at the following location:
Architect:
Birchfield Penuel & Architects 2805 Crescent Avenue
Birmingham, Alabama 35209 Mr. Alan Crotwell
205-870-1876
205-870-3058
C. BIDS BY PRE-QUALIFIED PRIME GENERAL CONTRACTOR BIDDERS
Documents:
After notice to pre-qualified bidders is given, the pre-qualified prime contractor bidders may obtain bid documents from the Architect (see address above) upon deposit of $100.00 per set. The deposit is refundable in full on the first two (2) sets issued to each prime general contractor bidder upon return of documents in reusable condition within ten (10) days after bid opening. Additional sets for pre-qualified prime contractor bidders, subcontractors, vendors, or dealers may be obtained upon payment of the same deposit. The deposit for additional sets shall be refunded less the cost of printing, reproduction, handling and distribution, upon return of the documents in reusable condition within ten (10) days after bid opening.
Bid documents will be available at the following locations after notice to pre-qualified bidders is given. Drawings and specifications may be examined at the Office of the Architect; and electronically at ConstructConnect and Dodge Data & Analytics.
Bonds:
A certified check or bid bond payable to the University of Alabama at Birmingham in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000 must accompany the bidder’s proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract.
Bids:
Bids must be submitted on proposal forms or copies thereof furnished by the Architect. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject bids if such action is determined to be in the best interest of the Owner. The Owner reserves the right to revoke pre-qualification of any bidder in accordance with Section 39-2-12, Code of Alabama, 1975, as amended in 1997 (by Act 97-225). The Bid Date is February 11, 2025 at 2:00 PM Central Time at the University of Alabama at Birmingham, UAB Hospital Planning, 2020 University Blvd., Birmingham, Alabama 35294. Bids shall be clearly identified on the exterior of the package with the bidder’s name, address, State license number, the name of the project being bid, time and place of the bid opening. Sealed bids shall be properly identified.
Proposals may be hand delivered or received by mail on the date of the bid opening at the Office of Jeff Orr, Project Manager Facilities and Capital Projects, 2020 Building, 2020 University Blvd, Birmingham, Alabama 35233, until 12:00 noon. After 12:00 noon of the date of the bid opening, proposals must be hand delivered and presented at the bid opening. Sealed proposals shall be submitted in triplicate and shall be properly identified. All proposals received after 2:00 p.m. on February 11, 2025 will be returned unopened.
Fire Alarm Work
In accordance with Title 34, Chapter 33A, of the Code of Alabama 1975, bidders for fire alarm work of this project, if any, must include with their bid, evidence of licensure as required by the act, by including with the bid submittal, a valid State Fire Marshal’s permit.
D. PRE-BID CONFERENCE
A mandatory Pre-Bid Conference will be held January 28, 2025 at 2:00 p.m. Meet at the UAB Highlands Main Lobby. It is mandatory that all pre-qualified prime contractor bidders attend the Pre-Bid Conference.
BT01/02/2025
______________________________
NOTICE OF COMPLETION
In accordance with Chapter 1, Title 39, Code of Alabama, 1975, as amended, notice is hereby given
Shelby Company LLC, Contractor, has completed the Contract for Construction of UAB North Pavilion 6th Floor New 1.5T MRI at 1802 6th Avenue South Birmingham, AL 35233 for the State of Alabama and the
City of Birmingham, Owner(s), and have made request for final settlement of said Contract. All persons
having any claim for labor, materials, or otherwise in connection with this project should immediately notify Birchfield Penuel Architects 2805 Cresent Avenue, Birmingham, Al 35209
ArchitectureWorks, Architect / Engineer.
Shelby Company LLC
Contractor
3120 4th Avenue South
Birmingham, AL 35233
BT01/02/2025
______________________________
NOTICE TO BIDDERS
The Birmingham Water Works Board will be accepting sealed bids for BID 24-03-14, “Filter Underdrain Repairs at Western Filter Plant,” until January 7, 2025 @ 10:00 a.m. The specifications and conditions may be examined and obtained in the office of the Purchasing Manager, Ly’Tonja Levert, at 3600 First Avenue North, Birmingham, AL 35222, by calling (205)244-4303, by emailing Tonja.Levert@bwwb.org, or on our website at www.bwwb.org. A mandatory pre-bid conference will be held on Monday, December 23, 2024, at 9:00 a.m. at the Western Filter Plant, located at 1400 Bankhead Highway West, Birmingham, AL 35217. You may mail your bid to 3600 First Avenue North, Birmingham, AL 35222, directed to the attention of the Purchasing Manager, and marked in the lower left-hand corner as follows: “BID 24-03-14, Filter Underdrain Repairs at Western Filter Plant, due 10:00 a.m. Tuesday, January 7, 2025.”
BT01/02/2025
______________________________
ADVERTISEMENT FOR BIDS
SEALED PROPOSALS will be received from General Contractors by Hoover City Schools, 1070 Buccaneer Drive, Hoover, Alabama 35244 until 2:00pm CST January 21, 2025 for this project:
“HVAC Upgrades at South Shades Crest Elementary, Hoover Hall, and Hoover City Schools Board of Education Office” Each facility will be an individual bid package as follows:
Package A: South Shades Crest Elementary
Package B: Hoover Hall
Package C: Hoover City Schools Board of Education Office at which time and place they will be publicly opened and read.
A cashier’s check or bid bond payable to Hoover City Schools in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder’s proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract.
Drawings and specifications may be examined at the office of the Engineer.
Bid documents (Plans, Specifications, and Addenda) will be sent to General Contractors only from the Engineer electronically with no deposit. Subcontractors should contact a General Contractor for documents.
A MANDATORY PRE-BID CONFERENCE will be held at Hoover City Schools Maintenance Facility, 1070 Buccaneer Drive, Hoover, Alabama 35244 at 10:00AM CST January 14, 2025 for the purpose of reviewing the project and answering Bidder’s questions. Attendance at the Pre-Bid Conference IS REQUIRED for all General Contractor Bidders intending to submit a Proposal and is highly recommended for Subcontractors. Bids from General Contractors not attending the Pre-Bid Conference will be rejected.
Bids must be submitted on proposal forms furnished by the Engineer or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Engineer; the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered.
The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner’s judgement, the best interests of the Owner will thereby be promoted.
Hoover City Schools
2810 Metropolitan Way
Hoover, AL 35243
Dewberry Engineers Inc.
2 Riverchase Office Plaza
Suite 205
Birmingham, AL 35244
BT01/02/2025
______________________________
NOTICE OF COMPLETION
In accordance with Chapter 1, Title 39, Code of Alabama, 1975, as amended, notice is hereby given that Jared Building Company Inc., Contractor, has completed the contract for HABD McCoy Building Renovations at 1301 25th Ave N, Birmingham, Al 35204 for the owner, Housing Authority of the Birmingham District and have made request for final settlement of said Contract. All persons having any claim for labor, materials, or otherwise in connection with this project should immediately notify the architect, CCR Architecture of Birmingham, Al.
Jared Building Company, Inc.
3232 Highway 28
Columbiana, AL 35051
BT010/2/2025
______________________________
IN THE DISTRICT COURT OF FORD COUNTY, KANSAS
In the Interest of
Lenny Ivan Xia-Yutan Case No. FO 24 JC 45
DOB: 2018 Sex: M
Genesis Belen Rodriguez-Xia Case No. FO 24 JC 46
DOB: 2020 Sex: F
Children.
Children of Yessica Gabriela Xia-Yutan and Omar Santizo and Miguel Barrientos
TO: Yessica Gabriela Xia-Yutan, Omar Santizo, Miguel Barrientos, Maternal Grandparents, Paternal Grandparents and all other persons who are or may be concerned.
NOTICE OF SUIT & OF HEARING
Pursuant to K.S.A. 38-2267
A petition was filed, requesting that L.I.X. G.B.R. be found children in need of care by the court on March 26, 2024 and the children was adjudicated as such on 17th day of July, 2024.
A motion to find the parent(s) of children named above unfit and to terminate parental rights, place for adoption or appoint a permanent custodian, or enter such orders as are deemed appropriate and just has been filed. A hearing on that motion will be conducted on the 7th day of January, 2025, in courtroom #2 of the Ford County Courthouse in the city of Dodge City, Kansas. The Court will receive testimony and other relevant information with regard to the safety and well-being of each children named above and may enter orders regarding custody and case planning necessary to achieve permanency for each child named above, including proposals for living arrangements for the children and services to be provided the children and the children’s family.
Your answer to the petition and response to the Motion for Termination should be filed with the clerk of the District Court of Ford County, KS, 101 W. Spruce, Dodge City, KS 67801.
/s/ Eliza Kassebaum
Eliza Kassebaum #28614
Chief Deputy County Attorney
BT01/02/2025
______________________________
( Use HABD logo)
HOUSING AUTHORITY BIRMINGHAM DISTRICT
NOTICE OF INVITATION FOR BID
INVITATION FOR BID (IFB) No. B25013
Loveman Village Daycare Renovation
Issued December 20, 2024
AGENCY CONTACT PERSON
Darryl Grayson, Procurement Analyst
Telephone: (205)521-0611
E-mail: dgrayson@habd.net
TDD/TTY: 800-548-2546
HOW TO OBTAIN THE RFP DOCUMENTS ON THE EPROCUREMENT MARKETPLACE
1. Access ha.internationaleprocurement.com (no “www”).
2. Click on the “Login” button in the upper left side.
3. Follow the listed directions.
4. If you have any problems in accessing or registering on the Marketplace, please call customer support at (866)526-9266.
PRE-BID CONFERENCE & SITE VISIT
Friday January 3, 2025 11:00AM
DEADLINE TO SUBMIT QUESTIONS
Tuesday January 7, 2025 4:00 PM CT
SUBMITTAL RETURN DEADLINE
Friday January 10, 2025 2:00 PM CT
1826 3rd Avenue South, Birmingham, Al 35233
[Section 3, Minority- and/or women-owned businesses are encouraged to respond]
BT01/02/2025
______________________________
INVITATION FOR BIDS
37-18-428 Old Looney Mill Road & Caldwell Mill Road over Cahaba River Tributaries Bridge Replacements
JEFFERSON COUNTY, AL
Encrypted electronic bids will be received by Jefferson County Commission Department of Roads & Transportation until 2:00 p.m. (local time); on Tuesday, January 28, 2025, for Old Looney Mill Road & Caldwell Mill Road over Cahaba River Tributaries Bridge Replacements project. All forms, information, and specifications are available for download free at www.bidexpress.com/businesses/54427/home The project includes grade, drain, base, pave and bridge replacement. All questions must be submitted through the Bid Express solicitation for this project. A non-mandatory pre-bid conference will be held on Thursday, January 16, 2025, at 2:00 p.m. in Conference Room A-200 of the Jefferson County Courthouse.
BT01/02/2025
______________________________
ADVERTISEMENT FOR A/E REQUEST FOR STATEMENT OF QUALIFICATIONS
DATE: December 18, 2024
FROM: Jefferson County Commission
General Services Department, Room 1
716 Richard Arrington Jr. Blvd. North
Birmingham, Alabama 35203
RE: REQUEST FOR QUALIFICATIONS
The General Services department on behalf of the Jefferson County Commission is conducting the A/E services selection process for the described Project.
PROJECT TITLE: Design of Lightning Protection Systems at various properties in Jefferson County, Alabama
PROJECT LOCATION: Various locations throughout the Jefferson County Commission footprint in Alabama
PROJECT ESTIMATED CONSTRUCTION BUDGET: TBD
DEADLINE FOR SUBMISSIONS: January 23, 2025, 2 P.M.
This project consists of the design and management of the installation of lightning protection systems at various buildings located in Jefferson County. The overall project is for all necessary materials, equipment, tools, and labor needed to provide a turnkey installation of a passive capacitor system to provide lightning protection for the various buildings in the Jefferson County, Alabama footprint.
The full design scope includes the development and preparation of plans and specifications, preparation of bid documents, assistance in the bid process, and construction. Architectural and Engineering design services shall include plans for comprehensive demolition of existing system components as needed and replacement with new system components, as well as building envelope specialist recommendations.
General requirements: The A/E shall be responsible for the professional quality, technical accuracy, and coordination of the engineering and design work; construction documents shall be signed and “sealed” by the responsible registered professional architect(s) and engineer(s).
The A/E shall coordinate with the appropriate public utility companies and commissions, if required, to prepare connection designs according to the applicable guidelines. Submissions shall be prepared (and revised and resubmitted, if necessary) for securing approvals, class of service, permits, and service hook-ups.
The work shall comply with all applicable City of Birmingham, Jefferson County, State of Alabama, federal codes and regulations. The work shall also comply with any applicable utility provider, construction industry and ASHRAE standards, requirements, and guidelines.
The work shall conform with the “to be established” project budget and scope, once finalized, throughout planning, design, and construction.
The A/E shall make site visits, attend meetings, produce meeting minutes, make presentations, utilize the services of consultants, and submit required deliverables as necessary to execute specific parts of the work ‘to be established’ and in the Contract and the Scope of Work for the project. The A/E will be available to perform optional construction phase services at the agreed upon rate, if requested by the Jefferson County Commission.
If you would like to be considered for this Project, please provide one (1) complete copy of your documentation to our office by the deadline indicated above. Minority, women and disabled veteran-owned enterprises (DBE) are encouraged to apply. Significant local participation is recommended for engineering services for firms outside the State of Alabama. All qualification submissions shall be made in hard copy, bound 8 1/2 x 11 format. Electronic files may be submitted in addition to hard copy. Electronic submissions are to be in PDF format transmitted via a USB drive delivered to our office by the deadline indicated above. Electronic files are not required but are preferred.
Please include the following items in your packet:
Identify each specific qualification request identifiable by associated item numbers and tabbed accordingly below:
Qualification Package
1. Introduction. Name, address and brief description of the firm.
2. Approach. A general statement of the firm’s approach to each of the project packages with particular focus on distinguishing characteristics or services.
3. Work proposed to be performed. A discussion of the firm’s understanding of the scope of services to be provided and the major work tasks to be performed.
4. Key personnel. A list of the proposed project team assigned to this project and their roles, previous related experience, education, and date that each person joined the firm. Include personnel resumes.
5. Relevant experience. A statement of the firm’s relevant experience, including a brief description of projects similar in scope and size as the proposed project. Include project title, dates work was performed, construction value, and client contact information.
6. List of Proposed Engineers/Technology Consultants. Provide a list of proposed engineers/technology consultants the firm plans to use for each specific package for this project. Include their statements of qualifications, profiles and lists of previous experience with projects similar in scope, value, size, and current client contact information.
7. Certificate of Insurance. Submit copy of firm’s certificate of insurance. Provide Professional and General Liability Insurance information including limits.
8. Litigation history. Provide information regarding your Professional Service Litigation history including a list of lawsuits in which your firm was a named party, as defendant of plaintiff, within the last 20 years.
9. Include statement of DBE status. State whether your firm is a Disadvantaged Business Enterprise, including minority, women or disabled veteran owned. Include statement of DBE status for each identified sub consultant/engineer listed for each package if applicable.
All questions regarding this project and submittal of the Statement of Qualifications shall be directed to Andy Olds, Committee Chair at email address andy.olds@jccal.org. Any contact with the selection committee team members other than Mr. Olds or his designee may disqualify the firm’s proposal from consideration.
BT010/2/2025
______________________________
PY 2025 ACTION PLAN
(July 1, 2025 through June 30, 2026)
ONE YEAR USE OF FUNDS SUMMARY AND 30 DAY COMMENT PERIOD
CITY OF BIRMINGHAM, ALABAMA
The City of Birmingham’s Community Development Department is preparing for its Program Year (PY) 2025 application cycle and Public Hearing for its PY 2025-2030 Consolidated Housing and Community Development Plan’s First Year 2025 Action Plan in conjunction with the U.S. Department of Housing and Urban Development’s (HUD’s) formula programs: Community Development Block Grant (CDBG), HOME Investment Partnerships Program (HOME), Emergency Solutions Grant (ESG) and Housing Opportunities for Persons With Aids (HOPWA).
The purpose of the public hearing will be to obtain comments regarding the proposed use of the referenced PY 2025 HUD consolidated Formula Allocation Program funding including the views of citizens, public agencies, and other interested parties on the housing and community development needs of the city, and to receive proposals for the possible use of the City’s PY 2025 Consolidated Formula Allocation from HUD. Also, citizens will be afforded an opportunity to 1. Identify housing and community development needs and priorities 2. Proposes of funds; 3. Comment on and review the City’s program performance.
The initial Public Hearings for the PY 2025 Action Plan outlines the City’s objectives and priorities for spending approximately $9.2 million of PY 2025 funds. Public Hearings will be held in a virtual format on January 8, 2025, and January 9, 2025, at 9:30 a.m. An in-person meeting on January 9, 2025, at 5:30 pm in the City Council Chambers located on the 3rd floor of City Hall, 710 20th Street North, Birmingham, AL 35203. The link to participate in the virtual public hearings will be made available on the City’s website-Community Development Department webpage https://cobcd.com/ by January 7th, 2025.
The PY 2025-2030 Consolidated Plan and PY 2025 Action Plan will be developed after considering citizen comments and proposals received after the Public Hearings conducted virtually by the City’s Community Development Department on January 8, 2025, January 9, 2025, at 9:30 a.m. An in-person meeting on January 9, 2025, at 5:30 pm. and from the timely receipt of written comments and online proposals received in the Community Development Department on or before February 10, 2025, at 4:00 pm.
You may submit completed proposals online via the Neighborly link on the Community Development Department website available January 10, 2025, and comments to the attention of:
Dr. Meghan Venable-Thomas, Director
Community Development Department
710 North 20th Street
Room 1000 – City Hall
Birmingham, Alabama 35203
At these public hearings, the application will be discussed in detail and potential applicants will have the opportunity to ask specific questions about proposed activities, funding priorities, and process. Application link will be available on the City’s website at https://cobcd.com/ beginning January 10, 2025.
Persons needing special assistance (such as translated materials or an application) or a reasonable accommodation to provide comments, please get in touch with the City of Birmingham at housingandcommunityinfo@birminghamal.gov or Randi Foy at (205) 254-2309. Please include, “Action Plan 2025 Request”, in the e-mail subject line.
BT01/02/2025
______________________________
NOTICE OF COMPLETION
In accordance with Chapter 1, Title 39, Code of Alabama, 1975, notice is hereby given that Specialty Turf Supply, Contractor, has completed the Contract for Construction of New Softball Field Dugout & Turf for
Oneonta High School at Oneonta High Softball Field, for the State of Alabama and the City of Oneonta, Owner(s), and have made request for final settlement of said Contract. All persons having any claim for labor, materials, or otherwise in connection with this project should immediately notify Lathan &Associates,
Architects .
Michael Hill, Contractor
120 Metrock Circle
Helena, AL 35080
BT 01/02/2025
_________________________________